WELCOME TO ALPINETECH

Innovative Solutions
for Mountain Resorts

We provide world-class engineering services for cable car systems and ski resorts.

Engineering Experience

Modern Infrastructure
Solutions

We are at your service with our team of experts specializing in industrial facilities and infrastructure projects.

- about us -

Safe and Innovative Transportation Solutions

Alpinetech Engineering, with over 10 years of experience in cable car, T-bar, and chairlift systems, we deliver world-class solutions. In addition to new rope installation, rope shortening, and splicing operations, we provide services through our expert team for annual periodic maintenance, major overhauls, and hydraulic system maintenance. We work to ensure the safety and quality of your facilities throughout the entire process, from installation to overhaul.

Learn More →
10+
YEARS OF ENGINEERING
EXPERIENCE

Facility Installation

Turnkey installation of T-bar, chairlift, and gondola systems.

Periodic Maintenance

Periodic facility maintenance and comprehensive major maintenance services.

Rope Operations

All mechanical rope operations, such as new rope installation, rope shortening, and rope replacement.

- services -

Setup & Installation

Turnkey solutions ranging from new facility installations to the modernization of existing systems. T-bar, chairlift, and gondola installation services.

More Information →

Periodic Maintenance & Service

Regular maintenance of your cable car systems, replacement of worn parts, and system optimization. Clamp inspections, general mechanical and hydraulic system maintenance.

More Information →

Rope Operations

Steel wire rope pulling, tensioning, shortening, and standard-compliant rope braiding operations.

More Information →

Drive Maintenance and Repair

Industrial motor drive equipment, including the physical cleaning of Siemens and other brands’ inverter systems, fan checks, parameter adjustments, and fault repairs.

More Information →

Non-Destructive Testing (NDT)

Reporting on your equipment in accordance with international standards using magnetic particle testing (MT), magnetic rope testing (MRT), and specialized NDT methods.

More Information →

Spare Parts

Fast delivery of original, long-lasting mechanical and electronic replacement parts for cable cars, chairlifts, and T-bar systems.

More Information→
- completed projects -
Denizli Teleferik Halat Hizalama
Denizli • 2025

Cable Alignment

At the Denizli cable car facility, the alignment checks on the steel cable, pulley adjustments, and necessary mechanical alignment procedures have been safely completed.

Yalnızçam Kayak Merkezi Telesiyej Bakımı
Ardahan • 2025

Chairlift Facility Maintenance

Periodic mechanical maintenance, clamp inspections, and general system tests were performed on the chairlift line at the Yalnızçam Ski Resort.

Fahri Telesiyej Bakım
Bursa • 2025

Chairlift Facility Maintenance

Periodic maintenance, including cable trimming and clamp inspections, at the Fahri chairlift facility in Bursa has been successfully completed.

Akropolis Teleferik MRT ve NDT
İzmir • 2026

MRT ve NDT

The Magnetic Rope Test (MRT) on the steel rope and the Magnetic Particle Inspection (MT) of the station weld points have been successfully completed.

Akropolis Teleferik Sürücü Fan Değişimi
İzmir • 2026

Driver Maintenance & Fan Replacement

Periodic maintenance has been performed on the facility’s main drives, and the cooling fans have been replaced.

Davraz Kayak Merkezi Volan Rulman Değişimi
Isparta • 2026

Chairlift Roller Bearing Replacement

In the chairlift system, the flywheel bearings at the upper station were replaced.

Denizli Teleferik Halat Kısaltma
Denizli • 2026

Cable Car Rope Shortening

The steel cable at the Denizli Cable Car facility has been successfully shortened.

Denizli Kayak Merkezi Telesiyej Halat Kısaltma
Denizli • 2026

Chairlift Rope Shortening

The steel cable on the ski resort's chairlift has been successfully shortened.

Denizli Teleferik MRT
Denizli • 2026

MRT Test for the Cable Car

The main cable of the Denizli Cable Car System was inspected using an MRT device; analyses of potential internal fractures, corrosion, and loss of cross-sectional area have been officially reported.

Denizli Kayak Merkezi Telesiyej MRT
Denizli • 2026

MRT Test for the Cable Car Chairlift

The carrier cable of the ski resort’s chairlift system was inspected using an MRT device; analyses of potential internal fractures, corrosion, and loss of cross-sectional area were officially reported.